F67 Series Parallel Shaft Helical Geared Motor

F67 Series Parallel Shaft Helical Geared Motor

F series Parallel Shaft-CZPTcal Geared Motor Qualities

1.Features:

  1. Higher efficiency: ninety two%-94%
  2. Parallel output, compact framework, big output torque, sleek operation, low noise and lengthy provider existence.
  3. Large precision: the gear is created of substantial-quality alloy metal forging, carbonitriding and hardening treatment, grinding method to make sure large precision and secure working.
  4. High interchangeability: hugely modular, serial layout, robust flexibility and interchangeability.

two. CZPT parameters

Ratio 3.seventy seven-276.77
Input electrical power .12-200KW
Output torque 3.5-21700N.m
Output velocity 5-352rpm
Mounting type Foot mounted, foot mounted with strong shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. 
Input Technique Flange input(AM), shaft enter(Advert), inline AC motor input, or AQA servo motor
Brake Launch HF-manual release(lock in the brake release place), HR-guide launch(autom-atic braking position)
Thermistor TF(Thermistor protection PTC thermisto)
TH(Thermistor defense Bimetal swotch)
Mounting Place M1, M2, M3, M4, M5, M6
Variety F37-F157
Output shaft dis. 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm
Housing materials HT200 large-energy forged iron from R37,47,57,67,77,87
Housing substance HT250 Higher strength forged iron from R97 107,137,147,
157,167,187
Warmth treatment technology carbonitriding and hardening treatment
Performance ninety two%-94%
Lubricant VG220
Security Class IP55, F class

CZPTshine Push

ZheJiang CZPTshine Travel Co.,Ltd,the predecessor was a state-owned armed forces mould company, was established in 1965. CZPTshine specializes in the complete power transmission solution for higher-end gear production industries primarily based on the intention of “System Product, Application Design and style and Expert Support”.
CZPTshine have a sturdy complex drive with above 350 employees at present, which includes more than 30 engineering professionals, 30 good quality inspectors, masking an area of 80000 square meters and sorts of innovative processing machines and testing equipments. We have a excellent foundation for the business application development and service of large-stop pace reducers & variators possessing to the provincial engineering technologies investigation heart,the lab of gear pace reducers, and the foundation of modern day R&D.

Our Group

Good quality Manage
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
solution is a product inspection to determine the qualified products.

seven. Certification.
All our goods get ISO & CE & UL certification.

Packing

Shipping and delivery

F67 Series Parallel Shaft Helical Geared Motor